In first three quarters of 2026, 48.3 GWh of battery energy storage systems (BESS) entered operation across the utility-scale and behind-the-meter (BTM) markets. This marks a y-o-y increase of 20%. The utility scale market continued to underpin growth with 40.8 GWh online. The BTM sector saw 7.5 GWh come online in the same Q1-Q3 period. In total eight states have seen their energy storage capacity increase by 100% or more.
In Q3, the utility-scale market saw 12.2 GWh come online across 45 projects, including three gigawatt-scale projects in just the first three quarters of 2026. In the BTM space, residential storage market added 746 MWh and commercial and industrial (C&I) added 1.3 GWh.
Across the US, states are increasingly moving from energy storage targets to procurement. In September, New York awarded contracts to eight BESS projects totaling approximately 950 MW in its first Bulk Energy Storage solicitation, while Illinois secured around 600 MW in its first storage procurement under the Clean and Reliable Grid Affordability (CRGA) Act. Our 2026-2030 outlook has increased, we now expect 708 GWh cumulative capacity online by 2030
The full Energy Storage Market Outlook report covers analysis of large load legislative updates, inverter supply chains, system pricing dynamics and developments in alternative chemistries within the manufacturing spotlight.
Q3 2026 saw BESS deployments of 14.3 GWh, down 1% compared to Q3 2025. The utility-scale market alone added 12.2 GWh of capacity. Across the quarter, three gigawatt-scale projects came online – four in Arizona, two in California and one in Utah.
Residential BESS deployments in Q3 2026 were the largest Q3 on record with 746 MWh of additions, a 16% increase y-o-y and the second consecutive quarter-on-quarter increase. Year-to-date installations remain 12% below the same period in 2025, when capacity was pulled forward ahead of the removal of 25D, but the recovery has been faster than expected. As a result, we have revised our 2026 outlook up to just under 3 GWh, an 8% decline compared to 2025.
The removal of 25D, while damaging, has not eliminated the underlying case for residential storage. Continued availability of third-party ownership supported by Section 48, higher electricity costs, changes to net-metering, increased outage concerns, and growing state support through virtual power plants (VPPs) and demand response programs continue to support the market. In California, SB 913, signed in September, creates a long-term, market-based pathway for customer-owned batteries in VPPs to qualify for resource adequacy, adding a further revenue stream for residential systems.
U.S. C&I and UPS BESS deployments reached 1.3 GWh in Q3 2026, up 29% y-o-y, bringing year-to-date installations to 5.4 GWh, already above the 4.8 GWh installed across the whole of 2025. C&I BESS demand continues to be shaped by the rapid expansion of data centers and the growing difficulty of securing sufficient grid capacity. As a result, “bring your own generation” is becoming an increasingly important development theme, with developers combining BESS with on-site or co-located solar and wind generation to increase energy independence, manage intermittency, and reduce exposure to grid constraints. Batteries can shift renewable output, manage rapid changes in data center demand, and provide short-duration backup, while high-power uninterruptible power supply (UPS) systems continue to address power quality requirements within facilities. Regulatory scrutiny of large loads is also increasing. in October, FERC rejected most of PJM’s interim proposal for integrating large loads. Greater flexibility requirements for large loads would further strengthen the case for on-site storage of potentially longer durations.
This quarter’s manufacturing spotlight focuses on Panasonic’s push into data center batteries. In June, the company announced a ¥350 billion (~$2 billion) investment over FY2026–2028, including plans to produce data center battery cells at its De Soto, Kansas plant, with mass production targeted for the fiscal year ending March 2029, alongside module manufacturing in Mexico. Panasonic is aiming for data center energy storage sales of at least $6 billion (¥950 billion) by FY2028.
Elsewhere, the conversion of EV cell manufacturing capacity to LFP for BESS continued. In July, Ultium Cells (LGES and General Motors) began LFP cell production for stationary storage in Spring Hill, Tennessee, while in October Samsung SDI began LFP production at its StarPlus Energy facility in Indiana, having secured more than 60 GWh of U.S. energy storage orders in 2026.
LFP is expected to account for 92% of lithium-ion BESS deployments in 2026, up from 77% in 2023, with lithium-ion making up over 97% of total installations.
The U.S. policy landscape for BESS since the start of 2026 has been a balancing act between domestic manufacturing ambitions, immediate grid needs, and energy security. Though there remains no final guidance regarding the precise methodology for Material Assistance Cost Ratio (MACR) calculations, states continue to codify the importance of energy storage, increasingly moving from targets to procurement, with Illinois and New York awarding their first dedicated storage contracts in Q3. Given the expected load growth across U.S. grids, we expect more of these announcements in future.